We have been renovating the bare half story of our house into a master suite. So far we have: taken out an unused chimney including patching the roof, torn up the subfloor and laid a proper one, put in some duct work, framed the walls, had insulation sprayed, had plumbing roughed in, and run most of the electrical with minimal blood drawn.
The following are some shots of the work done so far:
Planning the layout:
Taking down the chimney:
Sometimes things happened without the parents present (yes, he is standing on the bricks he is trying to take out):
The closet and bathroom walls from the bedroom area:
No comments:
Post a Comment